More Articles for redesign

Iowa's Jesup Bridge: From Beginning to End

Tina Grady Barbaccia - Feb 14, 2014

Iowa's Jesup Bridge: From Beginning to End

Buchanan County Secondary Roads plans to replace the bridge on V-65 south of Jesup, Iowa. The bridge will be replaced as part of a demonstration project using a new design software program developed by the Short Span Steel Bridge Alliance ...

Read More...

American Eagle updates installation, maintenance of SHD-60 hydraulic air compressor

Amanda Bayhi - Dec 31, 2013

American Eagle updates installation, maintenance of SHD-60 hydraulic air compressor

American Eagle has updated is SHD-60 hydraulic air compressor. The air compressor includes improvements to installation, maintenance and serviceability. A new metal enclosure with a flip-up lid provides easy access to check oil level and change the air filter. A reconfigured front-mount bulkhead ...

Read More...

25 Days of RollOuts: Kenco’s Barrier Lift

Tina Grady Barbaccia - Dec 16, 2013

25 Days of RollOuts: Kenco’s Barrier Lift

Handle precast barrier and curbing with the newly-redesigned Barrier Lift from Kenco, which grabs and releases wall automatically from inside the cab. Integrated handles enable ground personnel to guide the lifter, and a rotating pad that angles automatically to conform to ...

Read More...

advertisement

MORE STORIES

POPULAR

COLUMNS

BLOGS

advertisement

New Road Products

advertisement
advertisement