More Articles for geotechnical engineering

Illinois Tollway seeks to award $100 million in contracts

Tina Grady Barbaccia - Jun 14, 2014

Illinois Tollway seeks to award $100 million in contracts

The Illinois Tollway is looking to award 19 contracts worth about $100 million to provide design, construction management, geotechnical and materials engineering services for the agency’s 15-year, $12 billion capital program Move Illinois: The Illinois Tollway Driving the Future, the ...

Read More...

In Court

Better Roads Staff - Dec 01, 2012

In Court

"Differing site conditions" ... not always an obvious call   By Brian Morrow     The uncertainty that contractors face regarding unknown subsurface conditions can be their greatest risk. This type of risk is inherent on most road and heavy construction projects, commonly because testing ...

Read More...

Contractor’s differing site condition claim denied because soils reports indicated difficult soils

Better Roads Staff - Dec 01, 2012

Contractor’s differing site condition claim denied because soils reports indicated difficult soils

Contractor’s Differing Site Condition Claim Denied Because Soils Reports Indicated Difficult Soils (For a downloadable PDF of this "In Court," click here.) The uncertainty that contractors face regarding unknown subsurface conditions is the contractor’s greatest risk. This type of risk is inherent ...

Read More...

advertisement
advertisement

New Road Products

advertisement
advertisement