More Articles for bituminous sand mixture
Asphalt Recycling Section
A New Road at a Good Price
By Daniel C. Brown, Contributing Editor
The Utah Department of Transportation estimates that it saved more than $1.2 million with the Full Depth Reclamation (FDR) process for SR-68 near Saratoga Springs – compared to remove-and-replace reconstruction.
FDR ... Read More...
MORE STORIES
POPULAR
COLUMNS
BLOGS
- Sydney uses water curtains to alert drivers to stop (VIDEO)799 Views
- Obama signs memorandum to expedite infrastructure projects644 Views
- Florida’s Red Light Camera Game: G R E E N orange R E D374 Views
- Fifty cents on the dollar for Illinois roads264 Views
- FHWA deploys bridge-inspecting robots251 Views




