- Better Roads - http://www.betterroads.com -

Knife River operations pick up more than $41 million in new work

Posted By Tina Grady Barbaccia On September 20, 2010 @ 8:52 am In Economics,eRoadPro Newsletter,News & Analysis | No Comments

Knife River – Central Minnesota, based in Sauk Rapids, Minn., was the low bidder on a $14.3 million job in Minnesota’s Renville and McLeod Counties to complete a lengthy reconstruct and hot-mix asphalt overlay on Minnesota Truck Highway 212.

Knife River’s newest division, the Yellowstone Division in Billings, Mont., was the low bidder on a Montana DOT project to reconstruct approximately four miles of highway nearly 50 miles southwest of Billings, Mont. Knife River’s bid was $7.7 million.

The Yellowstone Division is in its first year of a six-year Montana Department of Environmental Quality project to reclaim a 35-acre area north of Yellowstone National Park containing nearly 300,000 tons of abandoned gold tailings.


Article printed from Better Roads: http://www.betterroads.com

URL to article: http://www.betterroads.com/knife-river-operations-pick-up-more-than-41-million-in-new-work/

Copyright © 2009 Better Roads. All rights reserved.