- Better Roads - http://www.betterroads.com -

Indiana DOT conducts lift bridge tests

Posted By Tina Grady Barbaccia On August 18, 2011 @ 3:16 pm In Industry,Press Releases | No Comments

The Indiana Department of Transportation (INDOT) conducted several test lifts on the Indianapolis Boulevard lift bridge on Aug. 24. Each test took about 20 minutes.

The routine tests will allow crews to open and close the bridge in different modes and observe its operation from various locations.


Article printed from Better Roads: http://www.betterroads.com

URL to article: http://www.betterroads.com/indiana-dot-conducts-lift-bridge-tests/

Copyright © 2009 Better Roads. All rights reserved.