- Better Roads - http://www.betterroads.com -
Dedicating the final highway project funded by 20-year Measure M
Posted By Tina Grady Barbaccia On September 27, 2010 @ 2:48 pm In eRoadPro Newsletter,News & Analysis | No Comments
The Orange County Transportation Authority (OCTA) and Caltrans will hold a dedication ceremony for the completion of the I-5 Gateway project, which began in 2006, on Sept. 28 at 1:30 p.m. PT.
The project has resulted in adding two lanes in each direction on the Santa Ana Freeway for two miles in Orange County from the Riverside Freeway (SR-91) to the county line.
The dedication will be held at 6277 Auto Center Drive, Buena Park, Calif. 90621 at Auto Center Drive and the northbound I-5 Beach Boulevard on-ramp.
The following people will be present at the ceremony:
The I-5 Gateway is the final freeway project funded by the original 20-year Measure M, Orange County’s half-cent sales tax dedicated to transportation improvements.
Article printed from Better Roads: http://www.betterroads.com
URL to article: http://www.betterroads.com/dedicating-the-final-highway-project-funded-by-20-year-measure-m/
Click here to print.
Copyright © 2009 Better Roads. All rights reserved.